top of page
City Tower
status:
location:
sector:
main contractor:
Completion Aug 2023
London UK
Residential
Multiplex
Complete fit-out of the 57 storey tower containing 334 residential apartments.
PAROC products installed to all M&E and domestic services throughout, along with acoustic insulation to the drainage system.
Raychem HWAT-R system for hot water services.
bottom of page